The
basic application of Flexiport is its ability to load, discharge and store all types of
cargo. The Port and its link to the shore can be installed and made operational in a
matter of days after arriving on site.
Flexiport converts virtually
any stretch of coastline into a port able to work ocean-going ships alongside,
incorporating all required types of cargo-handling equipment and whatever capacity and
nature of storage is needed. The link to the shore and the mooring technique are matched
to the specific requirements of the customer and the environmental constraints of the
site.
Whether as a permanent or
temporary installation, Flexiport has an immediate cost advantage over a conventional
build, because of the intensive fabrication carried out before transportation and
installation at the operating site. The Bulk Cargo Flexiport can adapt itself to
meet specific requirements. The quayside is positioned in the necessary depth of
water and is built giving the length and cargo handling area applicable to the expected
nature, frequency and volume of cargo to be handled.
All types of bulk cargo
handling equipment, i.e. for ore, coal, grain, etc., are suitable for use within this
Flexiport system. Tank tests have been carried out proving the barge base suitability for
both cargo handling and storage of bulk cargo of all types, including liquid commodities.
Flexiport reduces the risk of
incurring demurrage, because of the transportability of the system, it can be moved to any
area that may have a need to change their cargo handling requirements due to seasonal and
market conditions.
As with any major construction
project preplanning is of vital importance and we have the expertise in both design and
construction to assist port operators in the type, capacity and structure of both port and
storage space.
Flexiport can incorporate all
the ancillary equipment of a conventional port. Standard and specialised cargo handling
equipment, offices, communications and radar for port control, secure and bonded storage
areas and administrative arrangements for the labour force can all be included in the
original design, or added after the initial installation, as the need arises. |