Causeway

 

Return to Applications Menu Diagram Description

Return to top

Return to top

Flexiport's mooring system and its link to the road network ashore are designed  to match the geology and weather conditions of the site, the maximum anticipated loading of road traffic, the alongside depth of water required for the quay and the expected timescale of operation. The essential questions to be answered before detailed design work starts are where; how soon, and for how long the Flexiport is intended to operate, and what size ships and vehicles it is required to handle.

The choice of technique for shore linked and mooring lies with the customer and our design staff have worldwide experience in defining the most cost-effective solution in relation to operating conditions and specifications.

Causeways can be piled completely, ballasted, given slight buoyancy to compensate for a soft seabed, or made to float, held in position by piles or anchors all proven off-shore construction engineering techniques.  Bridges are prefabricated and moved to the site either complete or in sections ready for emplacement. These simple and robust constructions can be single or multispan, are very quickly positioned and have been proven in the most testing environments. More elaborate bridges can be built for permanent installations.

 

Return to top

Copyright © 2003 Flexiport